Manoj Singh and Parth Mittal are college friends. Both  of them completed their B.Tech from Bengaluru (Karnataka).

After completion of their respective studies, Manoj started to work with an MNC in Gurgaon as an Air Quality Analyst, while Parth was employed with a shipping company, named, Patliputra Port Trust in Kolkata.

They both share a prized desire of improving the air quality of the atmosphere/environment.

Manoj who was closely associated with the R&D of his Air Quality company, had developed a concept of a hybrid product, which can monitor, manage and suggest the combinations to improve the air quality. This concept, which was developed by Manoj was far superior, compared to existing air purifiers, available in the market, which has limited scope of purification. Manoj used a hybrid concept, which means the system uses a combination of Natural Plants and Machines.

Finally, one day both Manoj and Parth resigned from their respective jobs and formed a Private Limited Company in Bengaluru, named, PM Clean Air Solutions Private Limited (PMCASPL). Both friends were Directors in the company with 50% equity stake with each of them.

The Authorised capital of the company was Rs. 2,00,000/- (Rupees Two Lakhs) only. While initial Paid up capital was Rs. 1,00,000/- (Rupees One Lakhs) only. Both Directors introduced Rs. 50,000/- each as initial capital in the company.

After few months of company formation, both Directors, further invested Rs. 5,00,000/- each in the company.

They then start with research to understand how different plants helps in absorbing bad pollutants from the atmosphere and helps in improving the atmosphere naturally.

Next 9 months involved rigorous hard work by both directors. These months were spent in further improving the concept, already developed by Manoj earlier. After a lot of struggle they both reach a stage when there concept was now ready to take shape of a final hybrid product.

The final product developed, consisted of 3 separate units of which two were physical units and one was software, which were all synced as one single device.

The units were known as:

  • Air Sense: This physical unit will sense the air quality and will pass the data to the next unit, i.e. AQMS (Air Quality Management System). Air Sense is a 5 inch x 5 inch device which can be installed easily anywhere in a closed wall premises. Each Air sense can currently sense for an area of 1900 sq. ft. Multiple Air Sense device can be installed in a premise, depending upon the size of the location. Each Air Sense will pass data to the AQMS which is centralised server.

 

  • Air Quality Management System (AQMS): This is the software unit. AQMS will analyse data received from Air Sense and will send suggestion(s) to users on how to effectively use a mix of Air Loop/purifier and Natural Plants. AQMS is a centralised server installed in a premises.

 

  • Air Loop: This is the final physical unit, which acts as a purifier. Air Loop is 48 inch x 24 inch device. Each Air Loop can purify a closed wall area of 1500 sq. ft.

A total of 2 proto types were developed.

 

Cost bifurcation of Proto types

Items Unit Cost (Rs.)

Air Sense

15,000/- (can be reduced to 70% on bulk production)

Air Loop

8000/- (can be reduced to 55% on bulk production)

 

AQMS, cost of development: Rs. 1,20,00,000/-

AQMS software will attract regular updates and maintenances expenses from time to time.

AQMS unit will not attract per unit production cost, like the other physical units (Air Sense / Air Loop).

 

Other overhead expenses that the company is currently incurring:

Heads Monthly Cost (Rs.) Yearly Cost (Rs.)

Salary of two Software Developer

150000

18,00,000

Salary of Web Designer

35000

4,20,000

Salary of Mobile App developer

80,000

9,60,000

Rent of Premises (Maximum seating capacity is for 10 people currently)

25,000

3,00,000

Salary of two Field Executives*

30,000

3,60,000

Two Directors Salary

1,00,000

12,00,000

TOTAL COST 4,20,000 50,40,000

 

*Salary of Field Executives: The 2 field executives were under management trainee in the company. Their training is now completed and they have been offered full time employment in the company with revised salary package.

Their revised salary for both field executives now stands at: Rs. 40,000 pm. each

PMCASPL decided to approach angel investors who would help them achieve their dream by contributing towards Capital required to set up the plant. After meeting and discussions with various investors, SAIF capital agreed to invest INR 10 Cr in their project for a stake of 5% in equity.

PMCASPL also visited the famous television programme for investment to share the idea of their project. The judges/host appreciated their project a lot and was ready to invest INR 10Cr. The distribution of the total amount was INR 5Cr towards capital contribution for a dilution of 5% in equity and INR 5Cr as a Term Loan for a period of 3 years carrying ROI @12% p.a

PMCASPL has hired your company as a consulting firm with the aim of providing valuable insightful inputs.

PMCASPL has allocated total budget of INR 10 cr. for the financial year 2022-23.

The budget will include:

  • Setting up of a new production facility
  • Total Marketing expenses
  • Total Operational expenses
  • Consultancy expenses of Rs. 5,00,000/- pm (Your consultancy firm has bagged this prestigious offer)

Your consultancy firm is tasked to advise:

  1. New Production Set-up

Your company is responsible to oversee all important aspects in setting up a new production facility. You can advise the company PMCASPL on any matter related to production set-up.

  1. Marketing Plans

Your company has to formulate the entire marketing plan/strategy for the company.

  1. Pricing

Advise the company, on the right pricing mix/strategy.

  1. Operations + HR + IT

Give appropriate suggestions to the company on matters of operations, HR and IT.

It's the Leaders prerogative to recognize its team's talent pool and assign task to various department heads. All the suggestions/Plans should be backed by Data and Logic.

NOTE:

  • Submissions should be very crisp and focused.
  • While writing your solution, mention 'Image name' instead of inserting an image in that area and upload that image in the Attachment section with the same name.
  • Format of submission:
  • Assignment Taken: Mention assignment/s, you have taken for your department.
  • Title: (Give a title to your solution)
  • Case understanding: 3000 Characters max - Problems you understood from BSC, Pertaining to your department.
  • BCS Solution Summary: 3000 Characters max - Summary of proposed solution.
  • Solution: 20000 Characters Max (Mention Management principles used to derive solution)
  • Conclusion: 3000 Characters max.
  • PowerPoint Presentation will not be considered as the main solution, Teams should adhere to the above-mentioned format, If you wish to share a presentation you may attach that using upload tool on Business Case Solution Submission Page. Your PPT will be shown on your public solution page as an Attachment.
  • You can describe your attachment in text box given below attachment tool.
  • Last date and time for submission: - Sunday, 25th September 2022 21:30 IST.
Voting Weightage Table
Role Star Points Conversion
Judge 1 500
Industry Expert 1 300
Expert Faculty 1 300
Registered Participants 1 10